Cracking Documented
(Pre-Warranty Repair)
- July 23 2025
Visible cracks were observed and documented as part of the pre-warranty inspection process. The recorded evidence establishes the condition of the driveway before repair efforts began.
Supporting Evidence
Video
Pre-Repair Edge Cracking (Gate to Road)
- July 23, 2025
Recorded immediately before repair work began on the section of driveway from the entrance gate to the roadway. The video documents edge cracking, the condition of the concrete apron, concrete splatter on the brick entrance pillar from the original installation, and previously repaired areas visible as darker asphalt sections. The contractor stated the repair plan included replacing this section of driveway and installing a drain near the roadway to redirect standing water from the low area on the left side of the driveway.